Installation Manual
Installation:105. Snap the formed cover in placeover the fitting. Adhere themating surfaces of the innerarc joint with 520 or 520 BLVAdhesive. Join th
Installation:11SCREWEDPipeSize 3/8″ 1/2″ 3/4″IPS 45˚90˚T45˚90˚T45˚90˚T2" • • • • • • • • •2-1/2″••••••3" • • • • • •VICTAULIC COUPLINGSPipeS
Installation:12Yields of ... 4.c. measuring ...Throat Meas.HalfCircumferencePlus Throat Meas.PipeSizeOD ″PipeOD ″SheetThicknessR2R1ShortRadiusLongRadi
134.c. Armaflex sheet on90° elbows1. Check the type ell (long orshort radius) and size.2. Take throat measurement fromchart (R1). Swing an arc fromone
Installation:144.d. Armaflex sheet onflanged valve fitting coversThese instructions are meant toserve as a guide for insulatingflanged valves with Arm
Installation:156. The last piece of insulationneeded will insulate thebonnet area. This is shownin Figure 6 and is made asshown inFigure 6A. The measu
Installation:16Armaflex sheet on metalductworkThe preferred method for squareand rectangular ducts is to cutand fit the sheets, using full cov-erage o
Installation:17Flexible ArmaTuff Plus, ArmaTuffWhite or ArmaTuff Silver can beused for all exterior applications.They are practical also for use onext
Installation:18Pipe hanger locationsAt pipe hanger locations wherethe insulation must resist com-pression, supporting devicesmust be used in combinati
Installation:19AP ARMAFLEX SS INSTALLATION INSTRUCTIONSMake sure pipe is clean and dry.Wipe with a clean rag to removeany contaminants or moistureSnap
Armaflex Thickness Recommendations2For Controlling Outer Insulation Surface Sweating(Based upon available manufactured thicknesses)Contents:General in
ARMACELL LLC7600 Oakwood Street Extension • P.O. Box 1038Mebane, NC 27302TEL. 919 304-3846 • FAX 919 304-3847E-MAIL [email protected] www.a
1. To the contractor ...Armaflex Insulations are ideal forsuch mechanical systems asplumbing, hot-water heating, dualtemperature piping, air condition
Installation:4Sweat fittings on new pipe1. Before fitting is soldered, pushthe Armaflex back on the tubing,and hold in place withclamps applied to the
Installation:52. Armaflex on new piping: the slip-onmethodThe slip-on method is used whenyou can insulate new pipingbefore it goes up or while it’sbe
Installation:63. Armaflex on existing piping: the snap-on methodThe snap-on method is usedwhen pipe or copper tubing isinsulated after it has beeninst
7Installation:4. Fabricating fitting coversThis section includes:a. Using miter boxes, pg 8b. Using Armaflex Sheet onpipes, pgs 9 & 10b.1. Armafle
Installation:84.a. Using miter boxes1. Use a sharp, non-serratededge knife. Note the long knifelength shown in photo.2. On smaller pieces of ArmaflexP
Installation:94.b. Using Armaflex sheet insulation on pipes Application to pipes1. Apply Armaflex SheetInsulation on pipes larger than5″ IPS. Cut the